Transformer Maintenance & Testing

Placeholder: foto trafo distribusi sisi pelanggan belum tersedia

Lizztrik membantu BDV Test, DGA Test, TTR Test, Megger, PCB Test, oil purification, oil replacement, gasket/seal replacement, bushing inspection/replacement, breather/silica gel replacement, dan instalasi terminal/cable connection.

Diskusikan Kebutuhan

Testing

  1. BDV Test
  2. DGA Test
  3. TTR Test
  4. Megger / Insulation Resistance Test
  5. PCB Test

Replacement & Corrective Work

  1. Gasket / Seal Replacement
  2. Bushing Inspection / Replacement
  3. Breather / Silica Gel Replacement
  4. Instalasi Terminal / Cable Connection

Oil Treatment

  1. Oil Purification / Filtering
  2. Oil Replacement

Kondisi yang dibaca layanan ini

  • Kondisi Oil
  • Insulation
  • Rasio Winding
  • Koneksi
  • Bushing
  • Gasket
  • Breather
  • Komponen Pendukung

Kapan layanan ini dibutuhkan

Bukan jadwal tetap — kondisi berikut yang biasanya menjadi alasan pekerjaan dijalankan.

  • Trafo sudah lama tidak diperiksa
  • Oil condition perlu dibaca
  • Ada indikasi kebocoran
  • Breather / silica gel menurun
  • Bushing perlu diperiksa
  • Terminal connection perlu dirapikan
  • Testing dibutuhkan sebelum action
  • Klien membutuhkan rekomendasi sebelum shutdown

Mulai Diskusi Teknis

Kirim jenis aset, lokasi, kondisi saat ini, dan target waktu. Sisanya kami tanyakan bila diperlukan.

Kirim Data Aset